Official Detour for the Closed Vincent Thomas Bridge Floods in Wilmington, Trapping a Semi and Other Vehicles

The official truck detour around a closed harbor bridge in Wilmington, California, flooded Friday morning and trapped a semi and other vehicles.
Get Big Rig Daily every morning
The trucking stories drivers are talking about, in one short email. Unsubscribe any time.
After you sign up, check your inbox for an email from news@bigrigdaily.com and tap the button to confirm.
What happened
The flooding was on Harry Bridges Boulevard near Alameda Street, CBS Los Angeles reports. That road is an official state detour while the Vincent Thomas Bridge is closed for 16 months. KTLA also covered the flooding.
Rain and a high tide put the road underwater. At one point, as many as eight vehicles were stuck, including a semi. Some had to be towed. People who work nearby said the road usually takes on an inch or two at high tide, but this was much worse.
Get Big Rig Daily every morning
The trucking stories drivers are talking about, in one short email. Unsubscribe any time.
After you sign up, check your inbox for an email from news@bigrigdaily.com and tap the button to confirm.
State crews were pumping, though the tide was slowing them down. The road was closed Friday, with no reopening time announced. A county supervisor asked the state to pick a different detour, because more rain was on the way.
Why it matters to truckers
Port truck drivers leaving the docks need a reliable way around the closed Vincent Thomas Bridge. An official detour that can flood overnight leaves loads sitting and forces a scramble for a backup route. The ports have been unusually busy, including a record September at Los Angeles and Long Beach.
Quick facts
- Where: Harry Bridges Boulevard near Alameda Street, Wilmington.
- Role of the road: official state detour while the Vincent Thomas Bridge is closed for 16 months.
- Friday morning: rain and a high tide, with as many as eight vehicles stuck, including a semi.
- Status Friday: closed, with no reopening time announced.
FAQ
Is the Vincent Thomas Bridge itself flooded?
No. The bridge is already closed for 16 months of repairs. The flooding was on the official detour, Harry Bridges Boulevard.
A question for readers
Port truckers, if the official harbor detour can flood overnight, what is the backup route out of the docks?
Save this story for later

Sources
Get Big Rig Daily every morning
The trucking stories drivers are talking about, in one short email. Unsubscribe any time.
After you sign up, check your inbox for an email from news@bigrigdaily.com and tap the button to confirm.





