South Carolina Finishes the I-26/I-95 Interchange Six Months Ahead of Schedule, Replacing the Old Cloverleaf

The South Carolina Department of Transportation (SCDOT) has finished the I-26/I-95 Interchange Improvement Project six months ahead of schedule, replacing the old cloverleaf with flyover ramps at one of the state's most important interstate connections, The Trucker reported.
Get Big Rig Daily every morning
The trucking stories drivers are talking about, in one short email. Unsubscribe any time.
After you sign up, check your inbox for an email from news@bigrigdaily.com and tap the button to confirm.
Quick answer
The project replaced loop ramps with two flyover ramps that connect I-26 and I-95 more directly, fully rebuilt the interchange ramps and improved acceleration and deceleration lanes. New bridges carry I-95 over I-26, designed with room for future third and fourth through lanes in each direction. The last flyover, from I-95 northbound to I-26 westbound, is now open, ahead of the holiday travel season.
Key facts
- Project: I-26/I-95 Interchange Improvement Project
- Finished: six months ahead of schedule
- Old layout: a cloverleaf with multiple merging areas and lane changes
- New layout: two flyover ramps replacing loop ramps, rebuilt ramps, better merge lanes
- Bridges: new I-95 bridges over I-26, with room for future lanes
- Last piece: the I-95 northbound to I-26 westbound flyover, now open
Why the change matters
The old interchange required motorists to work through several merging areas and lane changes, which contributed to safety concerns, SCDOT said. The new design is meant to reduce congestion, improve safety and handle more traffic in the future on both corridors. "It's a great example of what we can accomplish through strategic investments, strong partnerships, and a commitment to delivering results," said Justin Powell, SCDOT secretary of transportation.
Get Big Rig Daily every morning
The trucking stories drivers are talking about, in one short email. Unsubscribe any time.
After you sign up, check your inbox for an email from news@bigrigdaily.com and tap the button to confirm.
Part of a 10-year plan
State Sen. Larry Grooms, chairman of the Senate Transportation Committee, said I-26 and I-95 are essential to moving people, products and commerce, and that their connection matters for economic growth in Berkeley County. SCDOT said the project is part of its Strategic 10-Year Plan.
Have you run through the new I-26/I-95 flyovers yet, and how do they compare?
Save this story for later

Sources
Get Big Rig Daily every morning
The trucking stories drivers are talking about, in one short email. Unsubscribe any time.
After you sign up, check your inbox for an email from news@bigrigdaily.com and tap the button to confirm.





