Local weather at weather.gov

Trucking News · Michigan ·

Gordie Howe Bridge Carries About 25% of Detroit-Windsor Commercial Traffic, Official Says

A long cable-stayed bridge over a wide river at sunrise with tractor-trailers crossing in both directions
Illustration for this story. Not a photo of a specific location.

About one in four trucks crossing between Detroit and Windsor now uses the Gordie Howe International Bridge, a bridge authority official said, less than four months after it opened, and the share is still growing week by week.

Quick answer

Heather Grondin, chief relations officer for the Windsor-Detroit Bridge Authority, told the Truckload Carriers Association's Truckload Forum in Mississauga, Ontario, on Nov. 19 that the bridge is "probably seeing about 25% of the region's commercial traffic," Truck News reported. The bridge opened July 27. When U.S. Customs and Border Protection set it up as a port of entry, its January 2026 final rule projected it would eventually draw 44.5% of commercial vehicle traffic among the four area crossings.

Key facts

What changed for truckers

The CBP rule notes that the new crossing has a highway-to-highway connection and says it will reduce heavy traffic on small roads and may improve safety. Truck News reported that U.S.-bound trucks using the Ambassador Bridge must work through more than 10 traffic signals on Huron Church Road in Windsor. Grondin said the gradual shift has let the bridge and border agencies refine procedures without being overwhelmed, that staffing is adjusted to traffic volumes, and that oversized loads must contact the bridge's Traffic Management Centre at least 24 hours ahead. One logistics company owner told the forum his fleet moved all of its crossings to Gordie Howe as of Nov. 1. Per-axle tolls add up fast on a five-axle rig; Big Rig Daily's truck weight and axle calculator helps with the axle count.

Analysis

The two shares are not measured the same way. CBP's 44.5% projection covers four crossings, including the Blue Water Bridge at Port Huron, while Grondin's 25% was described as the region's commercial traffic. Either way, the bridge authority's figure shows the shift is under way but well short of the federal forecast after about four months.

Has the new bridge taken enough traffic off the Ambassador Bridge, or is the shift still too early to judge?

Save this story for later

Tractor-trailers crossing a tall cable-stayed bridge over a river at sunrise, seen from the approach road

Sources